-21 June 2019- The general concept. |
 |
The pattern for part of the knee in 14ga. SS. |
 |
| Working the knee cops. |
 |
-29 June 2019- TIGing the cop together. |
 |
| Both knee cops are welded. |
 |
-1 July 2019- Semi Clean-up. |
 |
-2 July 2019- Lame articulation parameter. |
 |
 |
 |
 |
Lames on the steel. |
 |
 |
-3 July 2019- Lame aligning. |
 |
 |
 |
-5 July 2019- 2 Lame aligning. |
 |
 |
. |
-11 July 2019- Pattern for the cuisse. |
 |
 |
 |
 |
-12 July 2019- Shaping the cuisse. |
 |
 |
-15 July 2019- Shaping the second cuisse. |
 |
General feel of the upper leg armour. |
 |
-16 July 2019- Top of the cuisse. |
 |
. |
. |
-19 July 2019- The upper part of the cuisse outside. |
 |
Inside of the cuisse. |
 |
-20 July 2019- The cuisse side guard raw. |
 |
-20 July 2019- The cuisse side guard srated the line-up. |
 |
-23 July 2019- Work still on the cuisse outside. |
 |
 |
 |
 |
 |
. |
. |
-24/25 July 2019- Working on the back of the cuisse and hinges. |
 |
 |
 |
-2 Aug 2019- Working on the back of the cuisse. |
 |
Made a new pattern, had issues with the old one. |
 |
| Working the edges. |
 |
The general flow of the lines |
 |
-3 Aug 2019- The back lame of the cuisse. |
 |
 |
 |
-7/8 Aug 2019- New design for the sabatons. |
 |
 |
 |
-10 Aug 2019- Shaping the sabatons. |
 |
 |
 |
-20 Aug 2019- Starting on the greaves. |
 |
 |
. |
-21 Aug 2019- Working on the greaves, the general look. |
 |
 |
 |
-22 Aug 2019- Working on the greaves and rivet holder. |
 |
 |
 |
-26 Aug 2019- Working on the sabaton. |
 |
 |
 |
-27 Aug 2019- Working on the second sabaton. |
 |
-27 Aug 2019- Starting to equalize the greaves. |
 |
-30 Aug 2019- Working on the greaves / sabaton, the general look. |
 |
 |
 |
-2 Sept 2019- Working on the greaves. |
 |
 |
 |
-4 Sept 2019- Working on the greaves/sabatons after TIG welding. |
 |
 |
 |
-6 Sept 2019- Getting ready to TIG the greave to the lower part of the sabatons. |
 |
Closer look before the weld. |
 |
-9 Sept 2019- Working on the left greave. |
 |
 |
 |
-10 Sept 2019- Cleaning the left greave. |
 |
A general look to see if the look and feel the same. |
 |
-16 Sept 2019- Cow-mouth toe. |
 |
The pattern. |
 |
-17 Sept 2019- Both toes are done, now comes the back of the greaves. |
 |
. |
. |
-19 Sept 2019- Knee-cop side guards markup. |
 |
 |
 |
-20 Sept 2019- Pattern for the back of the greaves on steel. |
 |
Cut and ready to shape. |
 |
-23 Sept 2019- Starting to shape the back of the greaves. |
 |
More form. |
 |
-24 Sept 2019- Working on the sides. |
 |
The matching of the side shapes. |
 |
-27 Sept 2019- Working on the back of the greaves. |
 |
Working on the second one. |
 |
-30 Sept 2019- Working the parts together. |
 |
The general look, still some shaping to do. |
 |
-4 Oct 2019- Working on the lower part of the back greave. |
 |
Another look. |
 |
-7 Oct 2019- Getting the bottom in form. |
 |
The general look. |
 |
| With boot. |
 |
With the spurs. |
 |
| After the TIG weld raw work. |
 |
Raw work, to get the general idea. |
 |
| Matching and shaping the pieces together. |
 |
Another look. |
 |
| Matching the sides and worked on the overlap. |
 |
 |
 |
-21 Oct 2019- Mounting the Hinges. |
 |
 |
 |
| The general look. |
 |
 |
 |
-22 Oct 2019- New pattern for the side guard. |
 |
 |
 |
-28 Oct 2019- Working on the second back greave. |
 |
Mounted the hinges, still need to algin the sides and work more on the calve muscle on both. |
 |
-29 Oct 2019- Working on the side guards, still need to do the clean-up. |
 |
 |
 |
-1 Nov 2019- Working on the second side guard. |
 |
After raw cleaning.. |
 |
-4 Nov 2019- Welding the first side guard. |
 |
The general look.. |
 |
-5 Nov 2019- Starting the clean-up. |
 |
Keeping a space between the lames so they have room to move... |
 |
| This is the E-Clip so you can change the toe. |
 |
General look of the right greave... |
 |
11-6-2019 The last welding on this project. |
 |
Another look, now comes the clean-up... |
 |
11-8-2019 Worked on the last sabaton. |
 |
Started the clean-up and the last knee-cop. The E-Clip did not hold as well as this did. |
 |
11-9-2019 So the lower leg armour is done. |
 |
. |
. |
11-11-2019 How the back of the Cuisses hold. |
 |
 |
 |
| General update, need to make one more lame for the greave and the knee-cop. |
 |
 |
 |
11-12-2019 How to hold the greave to the lame. Amy helping to get these rivets set. |
 |
 |
 |
| The look of the . |
 |
One leg all done. All we need is the lamp Shade! |
 |
11-15-2019 Placed the brushed finish on the last parts of the armour. |
 |
Both legs are done, now some fine tuning and this goes in the mail. |
 |