-18 May 2015- The pattern on the steel. |
 |
The raw cut. |
 |
Lineup of the pieces. |
 |
Drilling the holes for the pin. |
 |
Both are now drilled. |
 |
Raw idea of the rest with the pin. |
 |
-19 May 2015- General update. |
 |
 |
 |
-20 May 2015- All the parts are 304 SS but the brass screws. |
 |
The End. |
 |